dc.description.abstractResults are reported from tests of small scale push-off and large-scale composite NU I-girder specimens conducted to establish an interface connection detail that 1) Facilitates in-situ removal of the bridge deck without damaging prestressed girders and 2) Maintains composite action between the prestressed girder and reinforced concrete deck throughout the service-life of the structure. Results are also reported from simple 3D models developed to simulate horizontal shear transfer in composite girders. Sixteen small scale push-off tests were conducted to investigate the influence of surface preparation, bond breakers (epoxy and roofing felt), and interface reinforcement properties (yield strength, reinforcement amount, and means of anchorage) on horizontal shear transfer between precast and cast-in-place concrete surfaces. Based on the push-off test results, a connection detail was proposed that consists of roughening the top flange of the girder directly over the girder web and debonding the remainder of the interface using No. 30 ASTM D4869/D4869M-16a Type I organic roofing felt. Three full-scale composite NU35 girders, designed and fabricated using the proposed connection detail and two control connection details, were then subjected to a series of tests. First, decks were cast and then removed to quantify the extent to which the proposed connection detail reduced the effort to remove the deck and to document the types and extent of damage caused to the girders by the process. After replacing the decks, the composite girders were subjected to 2×106 cycles of simulated traffic load and then loaded monotonically to failure. A series of 3D composite girder models were created in SAP2000 to better understand factors affecting the distribution of slip along the horizontal interface. The girder and deck were simulated using elastic frame and shell elements, respectively, and interface shear was simulated using a series of multilinear link elements. These models were used to simulate the experimental girder tests under service-level loads and to investigate the effects of beam aspect ratio and load position on the distribution of interface shear. The proposed connection (partially roughened/partially debonded with a roofing felt bond breaker) is a viable option for use in practice; its use led to a 2/3 reduction in the effort required to remove the deck over the girder and protected the girder from all non-saw-related damage while also effectively sustaining composite action through 2×106 cycles of simulated traffic load after deck replacement. The proposed connection can be conservatively designed by neglecting the debonded area when calculating interface shear strength. Other test results showed that surface preparation has a large influence on the stiffness, strength at cracking, and peak strength of a horizontal shear connection; each was greatest for specimens with a fully roughened surface followed by the partially roughened surface, troweled surface, and debonded surface. Increasing the amount of interface shear reinforcement increases the initial stiffness, shear strength at cracking, peak and post-peak strength, and does so more effectively than a similar increase in reinforcement yield strength. Casting and removal of bridge decks without bond breakers does alter the top surface of bridge girders, but the surface can be returned to a qualitatively roughened surface with reasonable effort and care. Despite the changes to the top girder surface caused by deck removal, composite action was developed across the interface and remained stable through 2×106 cycles of loading. Finally, the analytical study indicated that models of composite action that consider flexibility of the horizontal shear interface allow for a better estimation of the composite member stiffness and allow for a more accurate assessment of the distribution of slip along the interface than models based on a rigid connection. The interface shear force demand was, however, conservatively estimated for all cases considered with AASHTO provisions.
dc.format.extent210 pages
dc.language.isoen
dc.publisherUniversity of Kansas
dc.rightsCopyright held by the author.
dc.subjectCivil engineering
dc.subjectBond Breaker
dc.subjectComposite Action
dc.subjectDeck Removal
dc.subjectFatigue Test
dc.subjectNU I-Girder
dc.subjectShear Friction
dc.titleComposite Action in Prestressed NU I-Girder Bridge Deck Systems Constructed with Bond Breakers to Facilitate Deck Removal
dc.typeDissertation
dc.contributor.cmtememberHo, Alfred
dc.contributor.cmtememberLepage, Andrés
dc.contributor.cmtememberMatamoros, Adolfo
dc.contributor.cmtememberO'Reilly, Matt
dc.thesis.degreeDisciplineCivil, Environmental & Architectural Engineering
dc.thesis.degreeLevelPh.D.